Loading digital twin
Live A digital twin of a SURDS-run office

We engineer intelligence for the physical world.

Sensing, control and decision systems for environments that can't afford to fail.

Book a pilot →
Drag to look around · scroll to watch it think
01 · Sense

Every room,
reporting.

Wireless sensors map temperature, air, occupancy and power across the floor. No rewiring, no cloud round-trip — just a live picture of the building.

  • °CThermal & humidity in every zone
  • CO₂Air quality where people actually sit
  • kWPower at the rack and the panel
02 · Decide

Decisions made
in the room.

The edge gateway fuses every stream locally. It sees the workspace running hot and the cabin drifting before anyone reaches for the thermostat.

  • 1Signals fused on the gateway, not the cloud
  • 2Drift predicted, not just alarmed
  • 3Keeps working when the internet doesn't
03 · Act

The building
fixes itself.

Cooling rebalanced, empty rooms set back, idle equipment parked — automatically, and logged for your team.

  • ✓Comfort back on target
  • ✓Energy follows occupancy
  • ✓Every action auditable
Buildings & HVAC/Data CentersPARAM Shakti, IIT Kharagpur Clean Rooms/DronesISO 5–8 verified live Manufacturing/Energy & Utilities99.98% mesh uptime Healthcare & Labs/

THE COMPANY

Your infrastructure is
already talking.

Every floor, line and duct throws off signal long before anything goes wrong. Most of it dies where it was made, because the intelligence lives in a cloud far from the room. SURDS puts it on site — sensing, deciding and acting in the same place, at the speed the physical world actually moves.

The world drifts.
We hold it on target.

Sensor classes
0

Thermal, humidity, vibration, power and air — one mesh.

Mesh uptime
0
Clean rooms
ISO 5–8

Environments verified live, not at inspection.

HVAC share
0

of building energy goes to HVAC. We start there.

How it works · hover a step
SenseMesh sensors, every zone
→
DecideEdge gateway, on site
→
ActControl loop, logged

INDUSTRIES

LIVE FACILITY --:--:--

Every movement,
already a datapoint.

We generate keypoints your infrastructure didn't even know it could generate. Pick a facility below, then open the card to watch it happen live.

Sites online—
Channel—
Uptime99.98%
Select facility
LIVE · FACILITY SIM
MBKS POOL TELEMETRY
WATER TEMP
28.4 °C
PH LEVEL
7.38
PUMP FLOW
420 L/m
TURBIDITY
0.4 NTU
ALERT · PUMP #2 CAVITATION
Vibration anomaly detected (142 Hz). Automated flow bypass rerouted via Node #04.
NOTICE · SOLAR HEATING BOOST
Solar thermal collector efficiency at 91%. Maintaining target pool temp +0.8°C.
Movement Heatmap
CHECKOUT PRODUCE DAIRY ENTRANCE
HighMedLow

68% of foot traffic concentrates near checkout during peak hours.

Process Cycle Analysis
Reactor · Cook
42m
Vat Mixer · Blend
65m
Cool Tower
28m

Bottleneck: the Vat Mixer blend cycle — stagger batch starts to cut total cycle time ~18%.

THE NETWORK

A network that heals itself.

Every SURDS sensor joins an intelligent mesh. Nodes find each other, route around failures and keep reporting. No single point of failure. No silent gaps.

Self-formingSelf-healingEdge-native

Move your cursor into the mesh. Break a node. Watch it route around you.

LIVE · MESH SIM

NODES 42 · LINKS 000 · ALL PATHS NOMINAL

HARDWARE

Built to see what you can't.

Five sensor classes, one mesh. Every reading is timestamped, geo-tagged to its zone and streamed straight into the same engine you just watched think.

Thermal

±0.1°C · −40 to 125°C

IP67Mesh5yr battery
Live23.4 °C

Humidity

±2% RH · 0–100% RH

IP67Mesh
Live46 %

Vibration

0.5–2000 Hz · 3-axis

Magnetic mountMesh
Live2.1 mm/s

Current / Power

Non-invasive CT · ±1% accuracy

Clamp-onMesh
Live3.2 kW

Air Quality

CO₂ · VOC · PM2.5

IP54Mesh
Live612 ppm

PROVEN IN THE FIELD

IIT
Incubation

IIT Kharagpur

Incubated and built within India's oldest IIT.

HPC
Data centers

PARAM Shakti

Supercomputing facility, IIT Kharagpur.

ISO
Clean rooms

Electronics Dept. Clean Room

IIT Kharagpur.

ENGAGE

Bring intelligence
to your facility.

A scoped pilot on your site first. Production second. Tell us what failure costs you.

[email protected]

Response in 2 business days NDA on request Pilot-first engagement